BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
CALSCALE:GREGORIAN
PRODID:-//WordPress - MECv7.35.1//EN
X-ORIGINAL-URL:https://www.amac-org.com/
X-WR-CALNAME:AMAC
X-WR-CALDESC:Flight Plan for Success
X-WR-TIMEZONE:UTC
BEGIN:VTIMEZONE
TZID:UTC
X-LIC-LOCATION:UTC
BEGIN:STANDARD
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
TZNAME:UTC
DTSTART:20260902T214217
END:STANDARD
END:VTIMEZONE
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-PUBLISHED-TTL:PT1H
X-MS-OLK-FORCEINSPECTOROPEN:TRUE
BEGIN:VEVENT
CLASS:PUBLIC
UID:MEC-26d0c91010aed04a15325e72861cfee7@amac-org.com
DTSTART;TZID=America/Chicago:20260917T130000
DTEND;TZID=America/Chicago:20260917T170000
DTSTAMP:20260901T201256Z
CREATED:20260901
LAST-MODIFIED:20260901
PRIORITY:5
SEQUENCE:1
TRANSP:OPAQUE
SUMMARY:Connecting Construction &amp; Concessions at MSP Airport
DESCRIPTION:Join us for Connecting Construction &amp; Concessions at MSP Airport (MSP), a focused in‑person information session designed to help construction, design and architecture firms, concessions operators and ASCEND‑certified businesses understand what it takes to open a concession at MSP from a construction standpoint. Metropolitan Airports Commission experts will walk through the key steps, requirements and considerations unique to building in the airport environment. A networking session will follow to help attendees connect with potential partners.\nEvent details\n\nThursday, Sept. 17, 1 – 5 p.m. (1 – 3:30 p.m. speakers, 3:30 – 5 p.m. networking)\nA concourse pass is required. A REAL ID or passport is needed to obtain a pass.\nEvent capacity is limited to 140; please limit attendance to three people per business.\nNo virtual option is available.\nParking will be validated — please pull a ticket and bring it with you.\nAllow at least 30 minutes to park, gather a concourse pass, go through security and walk to Concourse G.\n\n
URL:https://www.amac-org.com/events/connecting-construction-concessions-at-msp-airport/
ORGANIZER;CN=Metropolitan Airports Commission:MAILTO:
CATEGORIES:Industry
LOCATION:MSP Airport - Terminal 1 Concourse G — The Great Room near Gate G17
ATTACH;FMTTYPE=image/webp:https://www.amac-org.com/wp-content/uploads/2026/09/Connecting-Construction-Concessions-at-MSP-Airport-.webp
END:VEVENT
END:VCALENDAR
